Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 27 results ...

Arora, R (1997) Role and influence of emerging social dynamics in decisions on investment opportunities in construction industry, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Bhattacharya, S (2011) Enablers of growth for construction companies in India: a strategic approach, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Deshpande, S D (1988) Some facility planning techniques for construction site layouts, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Jayesh, M P (2020) Inter-state migration for employment in India: a study on construction workers in Kerala, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Jha, K N (2004) Factors for the success of a construction project: empirical study, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Johari, S (2021) Effect of socioemotional cognitive, and technical competencies of workers on construction labor productivity, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kar, S (2021) Developing a decision support system for effective material management in construction, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Karimi, Z (2016) Construction project performance metrics: conceptualization, measurement and application in metro rail, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kuldip, C (1989) OR applications in strategic sector constructions with capital budgeting, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

  • Type: Thesis
  • Keywords: budgeting; capital budgeting; operational research; programming; heuristic
  • ISBN/ISSN:
  • URL: http://eprint.iitd.ac.in/handle/2074/5876
  • Abstract:
    Specific characteristics distinguishing constructions in strategic sectors include: block allocations over a number of consecutive time-periods; releases of resources (and funds) in upper and lower bounds; finances earmarked suffering diminutions in their realisable worth due to transfers over time and space. A certain category of problems refers to allocation of resources (and funds) to several projects at different sites with co-extensive headquarter control. The problem is to secure necessary funds for each project subject to the said diminution by transfers within the projects. Solution by LP formulation does not ensure allocations in consecutive years. Zero-One formulation can obtain allocations during consecutive periods allowing also for diminution of funds due to transfers but becomes too unwieldy for solution. A transportation algorithm has been developed along with a heuristic second stage of the algorithm to realise needful period-wise allocations for all projects at minimum cost in the needful transfers of funds. A second category of problems deals with situations where available funds are generally inadequate unlike as above. Zero-One formulation could not provide for inter-project priority so as to eliminate non-subscribable project units. An LP formulation is usable though the solution process becomes almost enumerative. Another category of problems involves sharing of multi-resources at multi-projects where the allocations beyond a floor level to each project are conditioned by the headquarter on specific goal realisations. A goal programming model proceeds with sequential decision-making with iteratively redefining the preferred levels of achievements in the several project components. A last category of strategic sector construction pertains to allocation of resources to individual units within a single project site without obligation to headquarter. The iterative goal settings and obtaining of satisficing solutions with higher magnitudes of achievements of project components are realisable faster than in the last-said category of problems. The applicability of the problem formulations and the solution methodologies have been demonstrated through case facts.

Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM), Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kumar, R (2020) Risk management framework for construction projects aligned to actualities, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kumar, S V (2019) Identification and modelling of risk factors, mitigation measures, and entry strategies for Indian construction firms in international markets, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Kumar, V S S (1993) Application of fuzzy set theory in construction management, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Maddah, R (2019) An analysis of risks faced by foreign construction firms in India and their effect on project performance, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Mathur, R N (1986) Perception of quality of working life and the related factors: a study of women workers in construction industry, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Patel, D A (2015) Estimating the number of fatal accidents and investigating the determinants of safety performance in indian construction, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Sharma, R (1998) Organizational role stress:focus on executives of construction industry, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.

Tripathi, K K (2018) Critical success factors for construction organizations in India, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.